Al-Shawi, M and Hope, A E (1989) Expert systems and contractual disputes: extension of time under JCT 80. Construction Management and Economics, 7(01), 65-74.

  • Type: Journal Article
  • Keywords: contract; dispute; expert system; extension of time; knowledge base
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446198900000007
  • Abstract:

    The resolution of contractual disputes is an area within the construction industry where complex rules and regulations are apparent and where much human expertise is currently employed monitoring and settling disputes. This paper describes research aimed at developing an expert system for the resolution of extension of time disputes arising under a UK standard form of building contract, JCT 80. The paper outlines the potential benefits of such a system, identifies how the system was developed and describes the working system and its limitations.

Green, S D (1989) Tendering: optimization and rationality. Construction Management and Economics, 7(01), 52-63.

Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(01), 19-28.

Hughes, W (1989) Identifying the environments of construction projects. Construction Management and Economics, 7(01), 29-40.

Kenley, R and Wilson, O D (1989) A construction project net cash-flow model. Construction Management and Economics, 7(01), 3-18.

Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(01), 75-86.

Tan, W (1989) Sub-sector fluctuations in construction. Construction Management and Economics, 7(01), 41-51.